New patent of AIG design for Gas Turbines. Successful installation in 400MW GT, AIG DN 22000x11000.
News
November
2009:
Installation
of light weight Mixers of Flowtech proven Flowte-X Mixers.
News
October
2009:
Optimization
of Quentsch tower after Cement production facility in USA.
New
International Flowtech Patent
August
2009:
Successful
international PCT application of our NEW Static Mixing Geometry!
The
new Flowte-C Mixer was invented and optimized over 1 year
by CFD, field tests and
expermental
modeling.
The Mixer is especially made for gas application for tail-end
and high-dust applications.
He shows several huge
advantages, as independent of incoming flow, does not destroy
the velocity profile, no errosion of dust, excellent mixing
performance of temperatures, Ammonia, etc., by lowest pressure
drop. A komplett new geometry!
For details and currently installed referencies, please contact
Flowtech direct.
News
July
2009:
Optimization of AIG for 2x 400MW Gasturbines HRSG.
(Flowtech
NEW AIG Design for HRSG, patent pending).
News
November
2008 :
Flow
optimization of existing power plant. Design of new flow devices
and static mixer:
News
Address
June
2008 :
Flowtech
moved into new bigger offices
E-mail and phone numbers
do NOT change.
New Office Address:
Flowtech Industries AG
Kronaustrasse 10
8404 Winterthur
Switzerland
News
October
2007:
Manufacturing
of an Ammonia Injection
Grid from Flowtech.
News
September
2007:
Flow
optimization of the flue gas denitrification system for a
chemical plant in France.
News
September
2007:
Installation
of Flowte-B and Flowte-X
mixers (direct injection application). The system was optimized
with CFD tools.
News
September
2007:
Installation
of two Flowte-X mixers
upstream of an electrostatic precipitator in a refinery located
in Austria.
News
August
2007:
CFD
study of a SCR plant including a water spray cooling system.
News
July
2007:
Delivery
of various key SCR system components for oil boilers, engines,
ammonia control units, evaporators, and mixers, among others.
News
June
2007:
SCR
duct design, experimental cold flow modeling and CFD analysis
performed for a FCC unit in California.
Original,
real size FCC plant with a view to the beatiful surrounding
beach area.
CFD
post processing plots.
Scaled
ductwork model in Flowtech
laboratory facilities.
News
May
2007:
Ductwork
and pressure drop optimization for a refinery with flue gas
temperature mixing problems.
News
April
2007:
Ductwork
optimization of a high dust SCR unit corresponding to a power
plant in Asia. The CFD results were compared with the experimental
cold flow model findings. For high dust applications with
a fly ash or a particle content of 100 mg - 30'000 mg, experimental
tests showed a higher accuracy.
News
March
2007:
Optimization
of a static mixing system for a dioxin catalyst application
corresponding to a refinery in Saudi Arabia..
News
February
2007 :
SCR
of waste incineration plants in Rome and Milano, Italy:
After optimizing the SCR of Rome's waste incineration site
(Colleferro), Flowtech
was assigned to conduct experimental flow tests and CFD calculations
for a comparable plant in Milano (AMSA).
News
January
2007 :
Optimization
of a AIG system located upstream of the catalyst reactor of
a H2 unit in California. The study concluded with a NOx /
NH3 molar ratio of 3.8 with a given mixing lenght of merely
l/dh<1.
News
January
2007 :
Successful
commissioning of Flowtech
demisters for chemical applications.
News
November
2006:
Optimization
of an injection system without static mixers concluding with
a remarkably low pressure drop.
News
November
2006:
Successful
start up of the SCR system of a waste incineration plant in
Europe. More than 95% of the initial NOx was removed.
The NOx concentration was lowered to 10 ppm. In addition,
no evidence of ammonia slip was given.
News
November
2006:
Thermal
power plant Gaobeidian with 4 x 600 MW coal fired boilers
in Beijing, China. Flowtech is invloved in six high dust SCR
units.
Pictures
of the inspection on site
News
October
2006:
On the top, a Flowte-X
static mixer DN 12000 for a 600 MW power plant in China is
illustrated. The figures below show the manufacturing of the
high dust SCR system optimized by Flowtech.
type
Flowte-X static mixer
(12000 x 3000 mm)
ductwork
erection of the 600 MW unit
News
September
2006:
Design
of a waste incineration unit including ductwork, injection
system and heat exchanger.
News
September
2006:
Design
of flow conditioning devices, injection system and mixers
downstream of a gas turbine.
News
August
2006:
Successful
commissioning of 6 SCR units for a 3000 MW coal fired power
plant in Korea.
View of the 6 x 500 MW units from outside (left illustration).
On the right, the experimental cold flow model at Flowtech
laboratory facilities is illustrated.
Ammonia
Injection Grid (AIG) system designed by Flowtech.
News
August
2006:
Design
and optimization of a cyclonic particle removing system. It
is able to remove more than 98% of the initial fly ash particles.
News
August
2006:
Flow
optimization including flue gas temperature mixing. The required
static mixing devices were designed to be manufactured from
Hastelloy.
News
July
2006:
Flowtech
successfully optimized a Flue Gas Desulphurization (FGD) plant.
The SO2 concentration in the 1'200'000 Nm^3/h flue gas stream
was due to be reduced from 6000 to 200 mg/Nm3. For this purpose,
CFD was employed. The interaction between the flue gas flow
through the scrubber and the dispersed limestone flurry was
studied. It included a computation of the multiphase flow
in the absorber zone.
absorber
tower spray bank details
absorber
inlet conditions
droplet
position and
flow velocity through the scrubber
life
time inside the scrubber
News
June
2006:
Examples
of CFD study results corresponding to a retrofit SCR unit
for a power plant in Asia (AIG, mixing, velocity distribution).
A
new release of Flowtech
droplet separators is presented. They are available for a
wide range of flow rates and moisture contents.
News
April
2006:
Flowtech
Industries AG proudly announces to enter into a cooperation
contract with Tsinghua Tongfang
for a 600 MW high dust SCR unit in China. Tsinghua
Tongfang will be supported by Flowtech
with the performance of experimental flow model tests and
CFD calculations, as well as with duct design consulting,
manufacturing of ammonia injection systems and static mixing
devices.
News
March
2006:
CFD
optimization for a power plant in Korea.
News
December 2005:
Thank
you to all our friends over the world for the excellent projects
and the confidence during 2005. The Flowtech
Team wishes you and your families all the best, peaceful Christmas
and a successful New Year!
Bernhard
Hug, Marcel Kramer, Andreas Tschenett, Susanne Auer, Simon
Meili
News
November
2005:
Successful start up of 3 SCR units for a waste incineration
plant in Belgium. The pictures below show Flowtech
ammonia equipment.
injection
lances from Flowtech
control skid from Flowtech
News
November
2005:
After
having used several CFD tools over the last years, Flowtech
now officially decided to work with Fluent, Gambit and T-Grid
software.
News
November
2005:
Permanently
looking for Sales Representatives
in Europe and Asia.
Conclusion
of a flow optimization study for a coal fired power plant
in Europe. The conducted work included the optimization of
the flue gas ducts, the minimization of pressure drop and
the mixing of gases. The plant will be operated with an ammonia
injection grid and static mixers designed by Flowtech.
News
October 2005:
Successful
commissioning of a Flowtech
mixing system for the SCR system of a gas turbine. A pressure
drop of less than 2 mbar, a NH3/NOx molar ratio below 3 RMS
and l/dh = 2.8 were achieved.
.
News
September
2005:
The
new website of our American joint venture company Flowtack
LLC is online: www.flowtack.com
News
September
2005:
SCR
box erection of a waste incineration plant in Spain. The duct
layout, the flow conditioning devices, the ammonia injection
system and the static mixing devices were engineered by Flowtech
Industries AG.
News
August
2005:
A
new computer based measurement system has been tested and
is ready to be used. With the new system, gas velocity and
temperature can be measured at 100 positions simultaneously.
Thus, complete cross sections can be measured in a short period
of time.
News
August
2005:
Efficient particle injection (CA(OH)2, among others) upstream
of a fabric filter for the dry absorbtion of SOx. A CFD study
of the injection system and the static mixing devices was
conducted.
News
August
2005:
Study
of an ammonia direct injection system for the tail end SCR
of a coal fired power plant. Ammonia, NOx and flue gas temperature
mixing problems were solved with Flowte-B/X
Static Mixing Systems. A pressure drop of less than
2 mbar was achieved.
News
August
2005:
Successful
installation of a type Flowte-B
mixer for chemical applications in Germany.
News
July
2005:
Successful
optimization of the flue gas flow through the SCR of a Fluidized
Catalytic Cracking (FCC) unit in Sweden. CFD calculations
and experimental flow model tests were conducted for this
project.
News
June 2005:
Flowtech
successfully optimized the flow through a baghouse with 8
chambers and 864 filter tubes per chamber. The baghouse is
installed downstream of a coal fired boiler with a flow
rate of 1'000'000 Nm^3/h. For this project, static mixers
and turning vanes were recommended.
News
May
2005:
Flowtech
was assigned to conduct a second flow optimization project
in Korea comprehending 6 high dust SCR units for a 3000 MW
coal fired power plant.
News
March
2005:
First
delivery of a state of the art mixer in North America.
News
February
2005:
The
newly optimized Flowte-X
static mixer shows an extremely low pressure drop. The device
was optimzed with CFD tools and experimental tests during
a period of time of 4 months. The new mixing system is successfully
operating in 4 units in Europe. The pressure drop does not
increase above 1 mbar in SCR plants with rectangular ducts
and a flue gas velocity below 12 m/s (max. 120'000 Nm^3/h).
Thus, a NH3 / NOx molar ratio of less than 5% RMS can be achieved.
For
detailed information please contact us at hug@flowte.ch
News
January
2005:
Successful
commissioning of a large scale pop-corn-ash
cinder screen arrangement in a high dust power plant. The
fly ash removal is guaranteed with the new arrangement recommended
by Flowtech without
producing any plugging problems at a high velocity level.
For
detailed information please contact us at: hug@flowte.ch
News
December 2004:
Flowtech
thanks all our friends, customers, partners
and suppliers for the good cooperation and the confidence
during this year.
The Flowtech Team wishes you and your families all the best,
peaceful Merry Christmas and a
successful New Year !
News
November 2004:
Flowtech at PowerGen North America
in Orlando (November 30 - December 3). In 2004, we stay together
with our American joint venture company Flowtack,
LLC (www.flowtack.com).